The township plowed and graded roads as needed in 2025.
Mowed Road Shoulders in 2025.
Checked roads for downed trees and brush after windy days, rainstorms and snowstorms.
Cleaned culverts that beavers plugged.
Spread 10 Loads of Class 5, 4 loads each on Moritz Road and Dangers Road, 1 Load each on Schneider Road and Chokecherry Lane. Spread 8 Loads of Red Rock. 7 loads on Little Bass Lake Road and 1 load on Darsnek Road. Cost was $6450.00